1.Dalian Zhongcheng Building Material Co., Ltd.
As a subsidiary of Dalian Chuangxin Construction Group Co., Ltd., Dalian Zhongcheng Building Material Co., Ltd. specializes in research, development, manufacture, sales, construction and service of energy-saving heat insulating materials for building walls and related products. Its predecessor was Construction Material Branch of Dalian Chuangxin Construction Co., Ltd. founded in 2005. With an aim to better cope with social development, we registered as an independent legal entity a few years ago.
We have a fully automated EPS board production line with a capacity of 120,000 cubic meters per year, and a fully automated coating production line with a capacity of 10,000 tons of latex paints for interior/exterior walls and floor paints. We also produce related supporting products.
All of our products have been tested by Dalian Construction Quality Test Center Co., Ltd. as in compliance with relevant technical specifications. We have our own R&D and testing labs equipped with a complete set of instruments for overall control over product quality.


2、Dalian Jinzhou HuaZhe Plastic Steel Door and Window Factory
Dalian Plastic Steel Door and Window Factory was established in 17 April 2001, its solid capital is a million yuan, liquid capital is eight hundred thousand yuan. Architecture area of workshop is 1445,59㎡, covering area is 5000㎡ and main products include plastic steel series door window and aluminum alloy series door window. Plastic steel series includes: 60, 66, 65, 70 平开series 

plastic steel door window, 62, 77, 95, 73, 80, 85, 88 series 推拉plastic door window, plastic spring door, hard plastic steel internal door and all kinds of plastic steel partitions. Aluminum alloy series includes: 90, 65series 平开aluminum alloy door window, 推拉aluminum alloy door window, aluminum alloy spring door, 推拉automatic door, 平开automatic door, all kinds of partitions and 隐框aluminum alloy glass curtains. The factory's construction production value in a year reaches to 4 million yuan and the ability of door window design, manufacture and installation is 10000㎡.

3、Dalian ChuangXin Gardens Afforest Engineering Company., Ltd
ChuangXin Gardens Afforest Engineering Company., Ltd was established in 13 Mar 2003 and its registration capital is a million and two hundred thousand yuan. Its main managing scope includes: garden afforest, construction 小品, construction sculpture and sell of flower and wood. Its former is Dalian Jinzhou Second Architecture Engineering Company Second Sub-company Afforest Construction Group. With division and reorganization of Jinzhou Second Architecture 

Engineering Company Second Sub-company, as the independent subordinate company of Dalian ChuangXin Construction Company., Ltd, it faces to society and contributes for gardens afforest. Main achievement in recent two years includes: finish 16250㎡DaXian special equipment factory plant side afforest; finish 41395㎡ double D port photo communication industrial garden plant side afforest and plant 1600 trees whose survival rate reaches to 100%.

4、Earthwork Increasing Project Construction
Earthwork increasing project aptitude of the company is third grade. The company owns 10 self-discharging earthmoving trucks, 1 pull-shovel grab and 4 platform trucks. Main achievement in recent two years includes: finish a hundred and forty thousand m3 earthwork of Jinzhou YuCai elementary school, two hundred thousand m3 earthwork of photo communication industrial garden and road;

two hundred and sixty thousand m3 earthwork of DaXian electron engineering; a hundred and ten thousand m3 basic earthwork of Dalian Art Professional College dormitory and three hundred thousand m3 earthwork of DaXian special equipment factory and road.
5、Steel Frame Engineering
Increasing project aptitude of steel frame is second grade. The company owns whole steel frame construction and testing equipments and instruments. The company may undertake steel frame engineering with not more than 24 meters span, not more than 600 tons weight and not more than 6000㎡monomer architecture area. The company may undertake manufacture and installation of wire frame engineering with not more than 24 meters side length, not more than 120 tons total weight and not more than 1200㎡ architecture area.
6、Electromechanical Equipment Installation Engineering
Increasing project aptitude of electromechanical equipment installation is third grade. The company may undertake installation of equipment, pipeline, circuit and piping of common industry, public and civil building projects with not more than 8 million yuan and manufacture and installation of NONSTD steel component.
7、 Hoisting Equipment Installation Engineering
Increasing project aptitude of hoisting equipment installation engineering is third grade. The company may undertake installation and demolition of hoisting equipment including construction tower crane, etc with not more than 800KN.M, undertake installation and demolition of crane and gantry crane with not more than 60 tons.
 